A further energy recovery process enabled Denco to capture the waste heat generated from 2 compressors from 2 different manufactures and connect the 2 systems together combining the heat recovered and therefore resulting in a useable duty for the identified heat transfer.
The heat recovered from the compressors was fed to a hot water coil that was immersed in a wash down tank that was essential for the customer’s process. The amount of energy saved allowed the customer to remove the gas burners that were being used at full capacity all year round to heat the bath, and replace them with Denco’s hot water coils resulting in the significant cost savings.
The installation of this equipment saved the user circa £20K per annum with an equipment payback of only 9 months.